Court structure
Posts, beams, bracing, base plates, mesh, glazing supports, joints, anchors and corrosion protection.
Develop a complete court brief from site conditions, playing requirements and supplier evidence. We coordinate the enquiry; factory, partner, engineering and compliance capability must be qualified before any production commitment.
PROJECT ENQUIRY · NO SELLABLE SKU, PRICE, INVENTORY OR FACTORY APPROVAL IS CONNECTEDNot an approved AG product, supplier, manufacturing location, certified court or available production capability.
Package boundaries make supplier capability, design responsibility and evidence easier to review. Final supply scope follows the approved site brief.
Posts, beams, bracing, base plates, mesh, glazing supports, joints, anchors and corrosion protection.
Glass build-up, edge finish, holes, tolerances, supplier, batch identification and supporting test reports.
Turf construction, yarn and backing data, infill type and quantity, seams, shock/ball response, drainage and maintenance.
Net, posts, tensioner, fixings, dimensional checks and inspection for sharp edges or entrapment.
Luminaire schedule, aiming, controls, photometric calculations, wiring and commissioning evidence.
Survey, slab/foundation drawings, levels, drainage, anchors and interface responsibility matrix.
Packing, method statement, inspection points, handover, maintenance, warranty and spares proposal.
Only sourced rule references appear as fixed values. All product-specific material selections and performance figures remain “to be submitted”.
| Topic | Reference / requested evidence | AG status |
|---|---|---|
| Court geometry | FIP Rules of Padel, application reviewed 01 Jan 2026: 10 × 20 m internal playing rectangle, stated tolerance 0.5%. Site clearances and foundation setting-out require project survey. | Reference requirement · verify for intended competition and jurisdiction |
| Free height | FIP rules state 6 m minimum clear height and suggest 8 m for new facilities. Confirm venue structure, luminaires and local building requirements. | Project check required |
| Playing surface | FIP allows cement, synthetic material or artificial grass subject to regular ball bounce; further requirements apply to synthetic/artificial turf. Select system only after use, climate, drainage and testing review. | Supplier system and test evidence pending |
| Enclosure & glazing | Court enclosure configuration is governed by FIP rules. Submit layout, glass specification, edge treatment, support details and independent test evidence for the selected system. | No AG glass grade or thickness approved |
| Metal frame & mesh | Submit design loads, member schedule, material traceability, weld and coating details, fasteners, anchorage and inspection records. | Partner and engineering qualification pending |
| Net & posts | Submit dimensions, tensioning details, post/base fixings, edge and entrapment review, and product inspection evidence. | Vendor data required |
| Lighting & electrical | Submit photometric layout, illuminance and uniformity calculations, glare assessment, electrical protection, controls and commissioning report for the project use. | Design basis and local electrical review pending |
| Civil works & drainage | Site survey, geotechnical input, foundation design, drainage route, levels, tolerances and interface details to be issued by the project design team. | Site-specific; not included by default |
| Installation & handover | Method statement, installation inspection plan, as-built records, maintenance schedule, spare-parts list and operator handover. | Scope to agree per RFQ |
FIP Rules of Padel are sports rules, not a complete structural design code or substitute for Indian building, electrical, fire, accessibility, environmental and procurement requirements. Project engineer to confirm the applicable editions and approvals before design freeze.
Use the worksheet to collect controlled supplier data by package. Blank fields are intentionally left for vendor evidence and engineering review.
Manufacturer and model, drawing revision, material grade, dimensions, finish, traceability, test evidence, warranty and review disposition.
Download submittal worksheet ↗Legal entity and site, process scope, quality system, equipment, weld control, inspection capability, capacity evidence, HSE and references.
Download supplier questionnaire ↗Not enabled for this line
Start enquiry ↗02Specialist scope only after approved commercial setup
Start enquiry ↗03Submit site, quantity and project reference
Start enquiry ↗04Start with a site plan, brief or early concept
Start enquiry ↗No payment or deposit is collected from these links. Quote and design routes open the existing AG RFQ workflow; a submission is an enquiry, not a manufacturing release.
Checked 02 November 2026. These sources establish reference context, not AG capability or product approval.
Playing-court dimensions, net, enclosure, access, surface, safety area and illumination rules. Competition/venue use and local regulations still need confirmation.
Primary source to check current rules and competition documents before technical release.
Padel-court safety and test-method work item; ISO lists it as a working draft under development, not a published standard or current certification basis.
Example of a federation approach to construction materials and third-party evidence (glass, mesh, net/posts, turf/infill, lighting). Spanish process; not automatically applicable in India.
Example independent test categories for turf, court equipment and lighting. It does not establish that AG products or any proposed supplier have been tested.
Current manufacturer catalogue example showing integrated court, turf, lighting and customization packages. Used to understand product-line structure only; no products, specifications or imagery copied.
Manufacturer example of disclosing court options and technical details. Used as market research only; no product claims or data imported into the AG offer.
Manufacturer example of publishing system details and technical downloads. Used only as a documentation pattern; no specifications or claims copied into the AG offer.
Manufacturing location, partners, certifications, materials, pricing and lead times remain subject to documented verification.
Bring the ambition. We’ll help structure the next step.
Build Your RFQ Book a manufacturing conversation