Aquatic Plant-Room Solutions / DEVELOPMENT DIRECTION
Pump and filter skid concept
AG-AQ-DRAFT-11-02 · Provisional reference

Discuss the requirements for a pump and filter skid concept as part of a aquatic plant-room solutions project brief. The solution and supplier are subject to review.
Discuss your project
Choose concepts below or from the collection. Set quantities, then continue to the existing enquiry form. Your selections are saved only in this browser until you submit.
0 of 60 concepts selected
Technical information
These are project-planning considerations, not approved product specifications. Dimensions, ratings and selected materials remain to be confirmed for this concept.
| Dimensions and weight | Set plant-room footprint and service clearances from the selected equipment and project layout. |
|---|---|
| Materials and finishes | Review pipework, supports, fixings and corrosion exposure for the actual installation. |
| Flow and pressure | Coordinate flow paths, pressure loss, isolation, backwash and drainage with the equipment schedule. |
| Electrical requirements | Coordinate connected loads, controls, protection and isolation with the electrical designer. |
| Installation and maintenance | Plan ventilation, drainage, lifting, maintenance access and safe chemical segregation. |
| Safety and standards review | Review electrical, pressure, chemical and confined-space risks with qualified specialists. |
| Technical documents to obtain | Plant layout, P&ID, equipment schedule, electrical load schedule and operating procedures. |
| Origin, feasibility, warranty and availability | To be verified for the selected design and supplier. |
Technical references
Independent guidance and manufacturer examples for research only. These sources do not verify this AG concept, establish an equivalence or imply a supplier relationship.
- Pahlén — swimming pool product catalogue and manuals (opens in a new tab)
- CDC Model Aquatic Health Code — guidance for public aquatic venues (opens in a new tab)
Technical sheets and certifications are not yet available for this direction.
Project review requirements
Aquatic equipment room coordination
- Review equipment footprint, isolation, drainage, ventilation and maintenance clearance.
- Coordinate electrical protection and safe access with project specialists.
Documents to confirm
- Plant-room layout and hydraulic schematic
- Electrical load schedule and equipment data