Heating & Cooling / DEVELOPMENT DIRECTION
Heating control integration
AG-AQ-DRAFT-07-04 · Provisional reference

Discuss the requirements for a heating control integration as part of a heating & cooling project brief. The solution and supplier are subject to review.
Discuss your project
Choose concepts below or from the collection. Set quantities, then continue to the existing enquiry form. Your selections are saved only in this browser until you submit.
0 of 60 concepts selected
Technical information
These are project-planning considerations, not approved product specifications. Dimensions, ratings and selected materials remain to be confirmed for this concept.
| Dimensions and weight | Confirm equipment envelope, hydraulic connections, service access and any ventilation clearance. |
|---|---|
| Materials and finishes | Review heat exchanger wetted materials and seals for water chemistry and corrosion exposure. |
| Flow and pressure | Determine required heat duty, pool-side flow, pressure drop and any heat-source circuit requirements. |
| Electrical requirements | Confirm voltage, phase, power and protective devices for the actual selected unit. |
| Installation and maintenance | Coordinate heat source, controls, condensate where applicable, isolation and maintenance access. |
| Safety and standards review | Review temperature controls, water flow interlocks and applicable electrical and plant safety rules. |
| Technical documents to obtain | Heat-loss and duty calculation, equipment data, connection schematic and manufacturer manual. |
| Origin, feasibility, warranty and availability | To be verified for the selected design and supplier. |
Technical references
Independent guidance and manufacturer examples for research only. These sources do not verify this AG concept, establish an equivalence or imply a supplier relationship.
- Pahlén — Maxi-Flo heat exchanger manufacturer information (opens in a new tab)
- Pahlén — swimming pool product catalogue and manuals (opens in a new tab)
Technical sheets and certifications are not yet available for this direction.
Project review requirements
Pool temperature control and energy source
- Confirm pool volume, operating temperature, climate and heat-loss assumptions.
- Review equipment duty, electrical supply, ventilation and corrosion compatibility.
Documents to confirm
- Heating and cooling load assessment
- Manufacturer equipment and electrical data