Pool Finishes & Decking / DEVELOPMENT DIRECTION
Pool lining system
AG-AQ-DRAFT-10-01 · Provisional reference

Discuss the requirements for a pool lining system as part of a pool finishes & decking project brief. The solution and supplier are subject to review.
Discuss your project
Choose concepts below or from the collection. Set quantities, then continue to the existing enquiry form. Your selections are saved only in this browser until you submit.
0 of 60 concepts selected
Technical information
These are project-planning considerations, not approved product specifications. Dimensions, ratings and selected materials remain to be confirmed for this concept.
| Dimensions and weight | Confirm area, substrate, falls, edge details and movement joints in the project design. |
|---|---|
| Materials and finishes | Review finish, adhesive, waterproofing and substrate compatibility with wet exposure and pool water. |
| Flow and pressure | Coordinate deck falls, drainage and overflow details with the pool design. |
| Electrical requirements | Coordinate bonding and lighting interfaces where relevant to the selected system. |
| Installation and maintenance | Review surface preparation, slip performance, cleaning and replacement requirements. |
| Safety and standards review | Select and verify wet-area performance against applicable project and local requirements. |
| Technical documents to obtain | Finish schedule, supplier technical data, installation details and test evidence where required. |
| Origin, feasibility, warranty and availability | To be verified for the selected design and supplier. |
Technical references
Independent guidance and manufacturer examples for research only. These sources do not verify this AG concept, establish an equivalence or imply a supplier relationship.
Technical sheets and certifications are not yet available for this direction.
Project review requirements
Pool finishes, edges and surrounding surfaces
- Review substrate, waterproofing system and water chemistry compatibility.
- Confirm wet-area slip resistance, drainage, transitions and maintenance with the project team.
Documents to confirm
- Finish schedule and material data
- Installation and maintenance instructions